O868 – S2369 – Seaham MYD Consulting Engineers

75% Complete

Project Description

According MSL V6.3 TUs L700/L1800/L2600/U900/U2100 will be implemented for this site(Regional GF).
Ph2, add 4th Sector, azimuth change to 0/90/180/270. 24/08/2017.
* Install one Huawei 12Port (ASI4517R1) antennas per sector.
* Install 5 RRUs per sector(1 RRU3262 for L7, 1 RRU3971 for L18, 1 RRU3281 for L26, 1 RRU3936 for U9, 1 RRU3971 for U21)
* Install two 700/900MHz diplexer per sector.
* Install two quadband combiners per sector.
* Install fibre trunk cables for RRUs as required.

Documents

Project Progress

75% Progress

100% Timing

Start Date

October 16, 2017

End Date

October 30, 2017

0/1

Approved Documents

6/9

Complete Milestones

3/4

Complete Phases

14/15

Complete Tasks

Milestones

6 / 9 Completed

75%

  • 10% Cover sheet + G1 Completion of Cover sheet and G1
  • 30% G2 + G3 + G4 Completion of G2 and G3
  • 40% A1 + A2 Completion of A1
  • 50% F1 Completion of F1
  • 65% Designer QA QA of FC drawings by designer officer
  • 75% Officer QA QA of FC drawings by QA officer
  • 80% Final Amendment Final amendment of FC drawings
  • 90% Preparation of HOP Preparation of Hand Over pack
  • 100% Submit Completed Job :) Submit Hand Over Pack

Phases

Expand Discussions | 3 / 4 Completed

FC drawings 0 Documents 10 / 10 Tasks 0 Responses

100%
Description

Completion of whole FC drawings by designer.

10 of 10 completedTasks

  • Cover Sheet 00 Bahar
  • Cover Sheet 01 Bahar
  • G1 Bahar
  • G2 Bahar
  • G3 Bahar
  • G4 Bahar
  • A1 Bahar
  • A2 Bahar
  • F1 Bahar
  • Designer QA Bahar

of 0 Approved No Documents Documents

No documents attached to this phase.

Discussion 0 Responses

Leave a Reply

QA Project By QA Officer 0 Documents 1 / 1 Tasks 1 Responses

100%
Description

QA FC drawings by QA officer

1 of 1 completedTasks

  • QA completed Daryoosh Asadi

of 0 Approved No Documents Documents

No documents attached to this phase.

Discussion 1 Response

  1. January 9, 2018 at 2:30 am
    Daryoosh

    QA has been completed by DA.

Leave a Reply

Final Amendment 0 Documents 0 / 1 Tasks 0 Responses

0%
Description

Final amendment on QA officer markups

0 of 1 completedTasks

  • Final markups amendment Bahar

of 0 Approved No Documents Documents

No documents attached to this phase.

Discussion 0 Responses

Leave a Reply

HOP pack 0 Documents 3 / 3 Tasks 0 Responses

100%
Description

Preparation of HOP files

3 of 3 completedTasks

  • SID Bahar
  • WHS Bahar
  • MYD Certificate Bahar

of 0 Approved No Documents Documents

No documents attached to this phase.

Discussion 0 Responses

Leave a Reply

Project Discussion 30 Responses to O868 – S2369 – Seaham

  1. December 12, 2017 at 6:19 am
    Daryoosh

    G3 and G4 have been prepared by DA and ready to close the job based on latest required information which we received from certifier.

  2. December 20, 2017 at 4:32 am
    Bahar

    Site owner is optus and NBN will be in this site as well so the site is colocate.

    Since the owner is optus, do we still need to add drawing E3 ?

    • December 27, 2017 at 3:27 am
      Daryoosh

      No we don’t need to consider E3 for this site as you mentioned owner is Optus and NBN will be added later on.

  3. December 20, 2017 at 4:34 am
    Bahar

    What is the No. of plan of feature survey can be found on :

    Lease, Licence & survey -> Site S2369 Seaham Lease Plan

    • December 27, 2017 at 3:30 am
      Daryoosh

      “99224” can be used for both sheets of survey.

  4. December 20, 2017 at 4:45 am
    Bahar

    Who will certify structure and foundation? TWO SEPARATE CERTIFICATE IS AVAILABLE FOR STRUCTURE AND FOUNDATION.

    POLE CERTIFICATE -> Seaham NSW S2369 IPC (24264_1)

    FOUNDATION CERTIFICATE -> 4108_ Cover+Found Cert_ SR4-BM40-675 and OTCs_ Seaham NSW _CommPlan_

    • December 27, 2017 at 3:34 am
      Daryoosh

      All Rocla poles always certified by Rocla and it’s foundation certified by GamCorp.

  5. December 20, 2017 at 4:49 am
    Bahar

    I have changed type and color of RRUs (5 RRUs were missing) in drawing G3 and the location of RRU in G4. Please confirm it.

    • December 27, 2017 at 3:36 am
      Daryoosh

      I didn’t understand what was your comment exactly.
      Let’s discuss this matter on today’s meeting.

  6. December 20, 2017 at 4:57 am
    Bahar

    EWP has osculated with Optus access path in design. Is it okay ?

    • December 27, 2017 at 3:38 am
      Daryoosh

      Let’s discuss this one on today’s meeting.

  7. December 20, 2017 at 5:08 am
    Bahar

    Clarence Town road is closed to the site. Why the site access is off warren street which is far from site and can not be shown on drawing G2?

    Site Address : 86 Warren Street SEAHAM NSW 2324

    • December 27, 2017 at 3:51 am
      Daryoosh

      As we discussed before, there are two different type of access.
      Access path and access route.
      Access path is already built access.
      Access route means there is no road and you need to follow the route to access to site as shown on G2.
      We have to show all streets or road to the site on G2.
      But for this specific site i checked the PD and found out from drawing the access is via Clarence town road and it has been written by mistake on note 7 of PD.
      At the end this is your responsibility to check access based on photos, access tab of FR and google maps to make sure what is the correct access on Detail design (FC) stage and you can not rely just on PD.

      • December 27, 2017 at 3:52 am
        Daryoosh

        On today’s meeting we can check together to make sure what is the correct route.

  8. December 20, 2017 at 5:11 am
    Bahar

    Please clarify type of fence. (OSD-141)

    • December 27, 2017 at 3:53 am
      Daryoosh

      Email has been sent to Ali for clarification.

  9. December 20, 2017 at 5:13 am
    Bahar

    Please kindly explain the difference between access path and access route which I have forgotten.

    • December 27, 2017 at 3:56 am
      Daryoosh

      Please refer to my comment above.

  10. December 20, 2017 at 5:17 am
    Bahar

    As far as I remember cable ladder should not be connected to the bay of OTC with meter box (BAY2). Therefore I changed the location of cable ladder and I connected it to the BAY1?

    *Actually cable ladder accommodates trunk cables so it should be connected to the bay in which technologies are installed.

    Please confirm.

    • December 27, 2017 at 7:45 am
      Daryoosh

      If we have 2 bay OTC, yes you are correct.
      one rack is for batteries and rectifiers and the other one is for other equipment which cable ladder goes through.
      Please note for more than 2 bay OTC, scenario is different and cable goes to the rack which contains cable management equipment.

  11. December 20, 2017 at 5:24 am
    Bahar

    Refer to Document Survey or RFNSA

    Coordinates are not the same in RFNSA and survey. Which one should be followed?

    Latitude and Longitude have not been mentioned in Survey. Therefore, Latitude and Longitude is the same , right?

    • December 27, 2017 at 7:47 am
      Daryoosh

      As we discussed before, In Greenfield sites surveyor goes to site and provide drawings with exact location of site so we have to follow survey, lease and licence lat. and long. always.

  12. December 20, 2017 at 5:25 am
    Bahar

    The distance between property boundary and the fence should be 200. Please confirm

    • December 27, 2017 at 7:51 am
      Daryoosh

      Please open OSD-130, OSD-131, OSD-133 or any other relevant OSDs for your answer.

  13. December 20, 2017 at 8:39 am
    Bahar

    We need 2 trunk cables

    12 RRUs are located in EL 41 m
    8 RRUs are located in El 40 m

    Length of both cables should be 55 ?

    or

    12 RRUs are located in EL 41 m -> Length of cable 50 m
    8 RRUs are located in El 40 m -> Length of both cable 55 m

    • December 27, 2017 at 7:53 am
      Daryoosh

      Please keep 55 m for both. ( RRUs at EL. 40 and 41 m.)

  14. December 20, 2017 at 11:21 am
    Bahar

    These two notes had not been added to DARKAN, I am not sure whether I should add it to SEAHAM or not.

    *FOR DETAILED CABINET LAYOUT REFER TO “BTS” TAB OF SSR.
    *FOR DETAILED CABINET LAYOUT REFER TO OTC-211 TAB OF THE OPTUS STANDARD RACK DRAWINGS. (OM38349)

    Which one is more prefable?

    OPTUS DC POWER RACK WITH BATTERY STRINGS (7 OFF) AND RECTIFIERS (8 OFF) TO BE INSTALLED AT LOCATION BAY2

    INSTALL 1 x OPTUS DC POWER SYSTEM TO BE EQUIPPED WITH 7 x 100AH BATTERY STRINGS and 8 x OFF 2kW RECTIFIERS.

    INSTALL 1 x OPTUS DC POWER SYSTEM TO BE EQUIPPED WITH 7 x 100AH BATTERY STRINGS and 8 x OFF 2kW RECTIFIERS AT LOCATION BAY2.

    • December 27, 2017 at 8:02 am
      Daryoosh

      -first two note should be added to your job.

      -my preferable sentence is first one but second and third are acceptable and note, it is exactly Huawei template wording. (second and third one)

  15. December 20, 2017 at 12:48 pm
    Bahar

    We need to talk about survey plan over the phone.

    • December 27, 2017 at 8:03 am
      Daryoosh

      Sure.

Leave a Reply