O860 – S1045 – Obanvale MYD Consulting Engineers

40% Complete

Project Description

Based on lastest MSL v6.1
* Existing TU – Optus Sector 1&3: L7/G9/U9/L26, sector 2: L7/G9/U9/U21/L26
For Optus:
* Reuse existing Commscope RV4PX310R (10-port) antenna.
* Install 1xRRU3971 per sector for L18
* Install 1xRRU3971 for sector 2 only, for U/L 2100.
* Install two quadband combiners for sector 2 only.
For VHA:
* Install one Commscope RV4PX310R (10-port) antenna per sector
* Install 5 RRUs per sector(1x for U850, 1x for U900, 2x for L18, 1x for U21)
* Install one 850/900MHz diplexer per sector.
* Install fiber trunk cable for RRU

Documents

Project Progress

40% Progress

100% Timing

Start Date

January 28, 2018

End Date

February 7, 2018

0/1

Approved Documents

3/9

Complete Milestones

2/5

Complete Phases

13/20

Complete Tasks

Milestones

3 / 9 Completed

40%

  • 15% Cover sheet + G1 Completion of Cover sheet and G1.
  • 30% G2 + G3 + G4 Completion of G2 and G3.
  • 40% A1 + A2 Completion of A1.
  • 50% F1 Completion of F1.
  • 65% Designer QA QA of FC drawings by designer.
  • 75% Officer QA QA of FC drawings by QA officer.
  • 80% Final Amendment Final amendment of FC drawings.
  • 90% Preparation of HOP Preparation of Hand Over pack.
  • 100% Submit Completed Job :) Submit Hand Over Pack.

Phases

Expand Discussions | 2 / 5 Completed

FC drawings 0 Documents 9 / 9 Tasks 0 Responses

100%
Description

Completion of whole FC drawings by designer.

9 of 9 completedTasks

  • Cover Sheet Mozhgan
  • G1 Mozhgan
  • G2 Mozhgan
  • G3 Mozhgan
  • G4 Mozhgan
  • A1 Mozhgan
  • A2 Mozhgan
  • F1 Mozhgan
  • Designer QA Mozhgan

of 0 Approved No Documents Documents

No documents attached to this phase.

Discussion 0 Responses

Leave a Reply

QA Project By QA Officer 0 Documents 0 / 1 Tasks 0 Responses

0%
Description

QA FC drawings by QA officer.

0 of 1 completedTasks

  • QA completed Bahar

of 0 Approved No Documents Documents

No documents attached to this phase.

Discussion 0 Responses

Leave a Reply

Final Amendment 0 Documents 0 / 1 Tasks 0 Responses

0%
Description

Final amendment on QA officer markups.

0 of 1 completedTasks

  • Final markups amendment Mozhgan

of 0 Approved No Documents Documents

No documents attached to this phase.

Discussion 0 Responses

Leave a Reply

HOP pack 0 Documents 4 / 4 Tasks 1 Responses

100%
Description

Preparation of HOP files.

4 of 4 completedTasks

  • SID Mozhgan
  • WHS Mozhgan
  • Certificate Mozhgan
  • Checklists Mozhgan

of 0 Approved No Documents Documents

No documents attached to this phase.

Discussion 1 Response

  1. February 5, 2018 at 11:34 am
    Mozhgan

    NO NEED TO ADD MYD CERTIFICATE

Leave a Reply

UG site requirements 0 Documents 0 / 5 Tasks 0 Responses

0%

0 of 5 completedTasks

  • Dial Before You Dig (1100) (If Applicable) Mozhgan
  • Structural Certificate Mozhgan
  • Structural Drawings (If Applicable)
  • Electrical Design (If Applicable)
  • Any Other Specific requirement

of 0 Approved No Documents Documents

No documents attached to this phase.

Discussion 0 Responses

Leave a Reply

Project Discussion 47 Responses to O860 – S1045 – Obanvale

  1. January 29, 2018 at 3:11 am
    Daryoosh

    Priority for Power is :
    1 – Photos
    2 – As Built

    FR doesn’t have any priority. (It can be just helpful for finding details)

    SO in this case 40A three phase is the correct answer as you mentioned in your email.

  2. January 29, 2018 at 3:13 am
    Daryoosh

    AC Power *

  3. January 29, 2018 at 3:15 am
    Daryoosh

    Please put a task in Asana and follow it up every week with Ali to get confirmation to remove it or relocate it.

    ” There are 2 x spare 3.7m MW dishes at E.L 23.0 which might block proposed Optus antennas. As per L1 response they have been decommissioned on 03/2011, but they are existing on the tower. In L2 submission, we need to ask if we can remove them.”

    • February 5, 2018 at 3:57 am
      Bahar

      follow up email sent to Ali (2018.02.03)

  4. January 29, 2018 at 11:14 am
    Bahar

    Since VHA antenna and RRU will be added to this site, I have been thinking we need to consider a place for VHA BTS RACK in shelter. What is your idea?

    The VHA DC power has been considered in phase 1, but nothing has been mentioned about VHA BTS RACK. Please clarify.

    • January 31, 2018 at 2:37 am
      Daryoosh

      Please check “Library\Catalogues and Brochures\ODUs and Shelters” and for example open Type C3 shelter and look at the BTS.
      In other hand check CAD block.

      • January 31, 2018 at 2:38 am
        Daryoosh

        Please check “OM38349_Optus_Standard_Rack_Drawings_v2.1” for racks as well.
        Sitel\Library\Instructions\Optus\Huawei

  5. January 29, 2018 at 11:19 am
    Bahar

    When there is 2 Dc power is site, do we need to check NONLAED operator for battery and rectifier?

    • January 31, 2018 at 2:39 am
      Daryoosh

      Yes that’s correct.
      Left hand side is Optus one and right is VHA.

  6. January 29, 2018 at 11:20 am
    Bahar

    when we remove a MHA which has 2 tails, Can we use that 2 tails for new RRUs or Combiners?

    • January 31, 2018 at 2:44 am
      Daryoosh

      We have the same situation in one of our Rancap jobs.
      i prefer to say “New tails to be installed if required otherwise existing tails of redundant ancillaries to be reused for new ancillaries”

  7. January 29, 2018 at 11:20 am
    Bahar

    What is conduit and where we should add the note for new conduit?

    • January 31, 2018 at 2:51 am
      Daryoosh

      conduit is “a tube or trough for protecting electric wiring.” (from google search)
      Also I paste few related catalogues to our jobs into the server :
      “Library\Catalogues and Brochures\Conduit – trench – Pit\Conduits”

  8. January 29, 2018 at 11:23 am
    Bahar

    As far as I checked FR, structel will send VHA mount design, Please confirm.

    • January 31, 2018 at 2:54 am
      Daryoosh

      Confirmed. 🙂

  9. January 31, 2018 at 1:02 am
    Daryoosh

    BG : “Following to the conversation with Ali regarding this project, he suggested me to put VHA antenna and RRUs schematically until we receive VHA mount design from Structel. Please kindly check the attached G3 and let me know your idea about it so I can proceed this job.”
    Answer : It looks fine at this stage.
    – Please consider antenna numbering/ tagging as per OSD-070 page 27. (It is not correct at the moment)

    • January 31, 2018 at 5:57 am
      Bahar

      RULE : I know that VHA antenna should be in the left side with antenna numbing of 11-V , 21-V , 31-V

      I forgot to ask a question regarding numbring . Since Optus antenna already exist in site and VHA antenna will be added to site, can we keep Optus antenna as a first antenna at each sector or we should follow the rule which has been mentioned in OSD-70?

      Besides, Fr has considered VHA antenna as a second antenna in each sector?

  10. January 31, 2018 at 6:01 am
    Bahar

    As far as we discussed regarding table A1, we came to the conclusion that we should follow proposed situation in table.

    But I am not sure about the situation where there is an existing VHA7 in site which will be removed in proposed plumbing diagram, should I show in MHA as a Existing or not?

    • January 31, 2018 at 6:08 am
      Bahar

      If you accept to remove MHA7 so please confirm that I can remove the feeders of MHA7 in table as well.

  11. January 31, 2018 at 6:07 am
    Bahar

    if you check sector 2 – antenna 1 – port 5 & 6 in as built

    It is written shared in port 5 & 6 for 1800/2100 technologies.

    You mentioned that each MHA needs 2 feeder cable, so how can it be shared?

    • February 1, 2018 at 11:27 pm
      Daryoosh

      There is a Diplexer/ Combiner below MHA 900 and MHA 18/21 which carry just 2 feeder and connect to these two combiners through 4 tails.
      Please look at the plumbing diagram.
      If you didn’t get the point then we can discuss over the phone. 🙂
      Note :You have too look at the new plumbing diagram for ports to consider in your new A1.

  12. January 31, 2018 at 6:12 am
    Bahar

    there is a discrepancy between AS Built and RFNSA address, please clarify.

    RFNSA ADDRESS:
    LOT 22 PLAN 816458 BRIDGMAN RD OBANVALE NSW 2330

    AS BUILT:
    TELSTRA CO-LOCATION , COORANGOOLA ROAD , SINGLETON, NSW 2331

    • February 1, 2018 at 11:28 pm
      Daryoosh

      Please follow As Built in this case.

  13. January 31, 2018 at 6:28 am
    Bahar

    What should be the title for drawing A1 in coversheet’?

    RF PLUMBING DIAGRAM (template)
    RF PLUMBING DIAGRAM – sheet 1 of 2 (As Built)

    • February 1, 2018 at 11:30 pm
      Daryoosh

      It depends to how many A sheet you have.
      Some times the table is too big so we have to consider A1, A2 and A3.
      So if you have one sheet table, follow the template.

  14. January 31, 2018 at 5:54 pm
    Bahar

    WHICH ONE IS BETTER?

    TELSTRA NETWORK SITE ID – 44097

    TELSTRA – NETWORK SITE ID – 44097

    TELSTRA SITE ID – 44097

    • February 1, 2018 at 11:32 pm
      Daryoosh

      You decide Bahar,
      All sounds good to me.

  15. January 31, 2018 at 5:59 pm
    Bahar

    What will be the work description & project type to choose correct distribution?

    Rancap

    Rancap EJV

    • February 1, 2018 at 11:36 pm
      Daryoosh

      I prefer RANCAP.

  16. January 31, 2018 at 6:48 pm
    Bahar

    I have also added these note in Drawing G1, please confirm if it is okay to keep them.

    3. NEW VHA ANTENNAS AND RRUs TO BE INSTALLED ON NEW VHA ANTENNA MOUNTS AND RRU MOUNTS ON EXISTING OPTUS FACE MOUNT.

    5. NEW VHA DIPLEXERS (3 OFF – 1 OFF PER SECTOR) TO BE INSTALLED BEHIND NEW VHA ANTENNAS.

    9. STRUCTURAL ADEQUACY OF NEW VHA ANTENNA MOUNTS AND RRU MOUNTS HAVE BEEN CONFIRMED BY STRUCTEL. REFER TO STRUCTEL CERTIFICATE REF: XXX DATED DD.MM.YY FOR DETAILS.

    • February 1, 2018 at 11:38 pm
      Daryoosh

      Just in note 3 delete “Optus” word.
      Rest are fine.

  17. January 31, 2018 at 7:36 pm
    Bahar

    As far as I checked the photos, optus has only one small cable ladder which directs cables into underground. Please confirm

    If yes, what will happen to new optus and VHA trunk cables?

    • February 1, 2018 at 11:40 pm
      Daryoosh

      We have to check if there is enough space for new cables to go through the same route.
      Please check it :

      4-50 (0.625˝ = 15.875mm), 5-50 = 7/8˝ (0.875˝ = 22.225mm), 6-50 = 1 1/4˝ (1.25˝ = 31.750mm), 7-50 = 1 5/8˝ (1.625˝ = 41.275mm)

      HUBER & SUHNER MLEH 6/12 (4 CABLES CAPACITY) – size : 27.50mm + 1.00mm diameter

      HUBER & SUHNER MLEH 9/18 (7 CABLES CAPACITY) – size : 39.50mm + 1.00mm diameter

      • February 5, 2018 at 4:30 am
        Bahar

        Existing Optus cables:

        6 LDF 5-50
        1 MLEH 6/12

        New optus cables:

        1 MLEH 6/12

        New VHA cables:

        1 MLEH 6/12
        1 MLEH 9/18

      • February 5, 2018 at 4:41 am
        Daryoosh

        For Optus, we have 10 RRU in total so if we already have 3 x MLEH 6/12 that would be fine. (no new cable is required)
        for VHA there are 3 x 5 RRUs = 15 RRUs in total so 3 x MLEH6/12 should be fine.
        cable ladder capacity is enough 100%.
        for conduit please assume it is okay till I QA the job.

  18. February 5, 2018 at 4:56 am
    Bahar

    We could not find COORANGOOLA ROAD in google map to show it in drawing G2.

    • February 9, 2018 at 12:05 am
      Daryoosh

      Please attach a photo for this note
      Optus VHA7 will be removed in proposed work.

    • February 8, 2018 at 11:48 pm
      Daryoosh

      Please get the unnamed road which comes from Bridgman road to the site as Coorangoola road. (Don’t write the name on drawing G2, just put annotate existing path)

  19. February 5, 2018 at 4:59 am
    Bahar

    Optus VHA7 will be removed in proposed work.

    Can we keep following note in AS Built?

    Existing optus antennas and equipment to remain untouched as per upgrade RANCAP scope of work.

    • February 9, 2018 at 12:07 am
      Daryoosh

      I couldn’t find the note “Optus VHA7 will be removed in proposed work.”
      Please upload a photo for your question.

      • February 12, 2018 at 11:08 am
        Bahar

        Please check the attached photo (MHA7.JPEG)

  20. February 5, 2018 at 11:44 am
    Bahar

    I have added VHA BTS based on the size which is mentioned in shelter type C3 but I am not sure it is correct.

    • February 9, 2018 at 12:12 am
      Daryoosh

      BTS size is 600 x 600 mm.
      But please consider you cannot put the power rack on the north side of shelter as what you did. ( Because of the above cable tray)
      Please move it to the location of the desk.

  21. February 5, 2018 at 11:46 am
    Bahar

    We compared Elevation with photos and removed some of antennas which could not be seen in photos. However, we are not sure about El notes. It is even different from RFSNA.

    • February 9, 2018 at 12:17 am
      Daryoosh

      Without providing photos from asbuilt, RFNSA or any other things you compare it with, I cannot help you.

  22. February 5, 2018 at 11:47 am
    Bahar

    RULE : I know that VHA antenna should be in the left side with antenna numbing of 11-V , 21-V , 31-V
    I forgot to ask a question regarding numbring . Since Optus antenna already exist in site and VHA antenna will be added to site, can we keep Optus antenna as a first antenna at each sector or we should follow the rule which has been mentioned in OSD-70?
    Besides, Fr has considered VHA antenna as a second antenna in each sector?

    • February 9, 2018 at 12:19 am
      Daryoosh

      You can ignore the rule as existing antennas are already installed. (You can keep Optus antennas as a first antenna at each sector)

Leave a Reply