O741 – A0578 – Yongala MYD Consulting Engineers

44% Complete

Project Description

According to “MSL SA3 v5 5 – 20161019” , “Huawei RF Planning Result_Site and TU List_ 20150930_finalfinal” and “A0578_SDB”, TUs L700/U900/U2100/L2600 will be implemented for this site. According to MSL v5.5 Change Log, U21 is cancelled as part of Idaho but U21 is planned as DESIGN ONLY” for phase 1 & phase 2. U21 will not be installed & deployed in phase 3.

* Install one 12 port Huawei ASI4517R1 antennas per sector.
* Install four RRUs per sector.
* Install two 700/900 combiners per sector.
* Install one 850 rejection filter per sector.

Documents

No documents at this time.

Project Progress

44% Progress

100% Timing

Start Date

December 26, 2017

End Date

January 5, 2018

3/9

Complete Milestones

0/5

Complete Phases

12/25

Complete Tasks

Milestones

3 / 9 Completed

44%

  • 15% Cover sheet + G1 Completion of Cover sheet and G1.
  • 30% G2 + G3 + G4 Completion of G2 and G3.
  • 40% A1 + A2 Completion of A1.
  • 50% F1 Completion of F1.
  • 65% Designer QA QA of FC drawings by designer.
  • 75% Officer QA QA of FC drawings by QA officer.
  • 80% Final Amendment Final amendment of FC drawings.
  • 90% Preparation of HOP Preparation of Hand Over pack.
  • 100% Submit Completed Job :) Submit Hand Over Pack.

Phases

Expand Discussions | 0 / 5 Completed

FC drawings 1 Document 8 / 9 Tasks 0 Responses

89%
Description

Completion of whole FC drawings by designer.

8 of 9 completedTasks

  • Cover Sheet Mozhgan
  • G1 Mozhgan
  • G2 Mozhgan
  • G3 Mozhgan
  • G4 Mozhgan
  • A1 Mozhgan
  • A2 Mozhgan
  • F1 Mozhgan
  • Designer QA Mozhgan

of 1 Approved No Documents Documents

No documents attached to this phase.

Discussion 0 Responses

Leave a Reply

QA Project By QA Officer 1 Document 0 / 1 Tasks 0 Responses

0%
Description

QA FC drawings by QA officer.

0 of 1 completedTasks

  • QA completed Daryoosh Asadi

of 1 Approved No Documents Documents

No documents attached to this phase.

Discussion 0 Responses

Leave a Reply

Final Amendment 1 Document 0 / 1 Tasks 0 Responses

0%
Description

Final amendment on QA officer markups.

0 of 1 completedTasks

  • Final markups amendment Mozhgan

of 1 Approved No Documents Documents

No documents attached to this phase.

Discussion 0 Responses

Leave a Reply

HOP pack 1 Document 3 / 4 Tasks 0 Responses

75%
Description

Preparation of HOP files.

3 of 4 completedTasks

  • SID Mozhgan
  • WHS Mozhgan
  • MYD Certificate Mozhgan
  • Checklists Mozhgan

of 1 Approved No Documents Documents

No documents attached to this phase.

Discussion 0 Responses

Leave a Reply

GF site requirements 1 Document 1 / 10 Tasks 0 Responses

54%
Description

All site Requirements for a green field site. (e.g. Geotech. Report, Structure drawings, Structure Certificate, Foundation drawings, Foundation Certificate, Dial Before You Dig, Electrical Design, PVA/ EVA, Power offer and etc.)

If any of above requirements doesn’t apply to this job, then tick the box and in this section discussion write N/A for this specific requirement.

1 of 10 completedTasks

  • Geotech. Report Mozhgan
  • Dial Before You Dig (1100) Mozhgan
  • Lease & Licnce Mozhgan
  • Structural Certificate Mozhgan
  • Structural Drawings Mozhgan
  • Foundation Certificate Mozhgan
  • Foundation Drawings Mozhgan
  • Electrical Design Mozhgan
  • Power Offer & EVA/ PVA Mozhgan
  • Any Other Specific requirement Mozhgan

of 1 Approved No Documents Documents

No documents attached to this phase.

Discussion 0 Responses

Leave a Reply

Project Discussion 6 Responses to O741 – A0578 – Yongala

  1. December 27, 2017 at 6:40 am
    Mozhgan

    PROGRAM DETAIL IS EMPTY PLEASE ADD THE WORK AUTHORITY AND WORK DESCRIPTION

    • December 27, 2017 at 8:06 am
      Daryoosh

      Please check the “WA ID” file at location below :
      Google Drive\Jobs\Optus\O1029 – S8335 – Frederickton\Design Files\Program details

  2. December 27, 2017 at 7:51 am
    Mozhgan

    PLEASE LET US KNOW ABOUT FENCE TYPE

    • December 27, 2017 at 8:08 am
      Daryoosh

      Fence Type request has been raised and waiting for respond.
      As soon as i receive it, I will send it to you.

  3. January 6, 2018 at 4:29 am
    Mozhgan

    we are trying to send you a massage

    • January 7, 2018 at 11:20 pm
      Daryoosh

      Finally it has been fixed.
      Thanks.

Leave a Reply

Update Status

Document Status Updated

Notifications have been sent.

Loading

Add Document

Upload    Web Address