O1005 – S5839 – Elizabeth Beach MYD Consulting Engineers

100% Complete

Project Description

Rev1.0: As per RANCAP CR, L18 TU Addition
Existing plumbing drawing is based on AB found on MNIS. TO BE VERIFIED DURING SDV. .
*Keep the configurations of other technologies as is.
*Install one L1800 (RRU 4T4R) RRU per sector for Sectors .
* Tail length should not exceed 5m.
* Plumbing diagram maybe different from actual on-site. Need to record all equipment and verify on SDV.

Documents

No documents at this time.

Project Progress

100% Progress

100% Timing

Start Date

October 16, 2017

End Date

October 19, 2017

9/9

Complete Milestones

4/4

Complete Phases

14/14

Complete Tasks

Milestones

9 / 9 Completed

100%

  • 10% Cover sheet + G1 Completion of Cover sheet and G1
  • 30% G2 + G3 + G4 Completion of G2 and G3
  • 40% A1 + A2 Completion of A1
  • 50% F1 Completion of F1
  • 65% Designer QA QA of FC drawings by designer officer
  • 75% Officer QA QA of FC drawings by QA officer
  • 80% Final Amendment Final amendment of FC drawings
  • 90% Preparation of HOP Preparation of Hand Over pack
  • 100% Submit Completed Job :) Submit Hand Over Pack

Phases

Expand Discussions | 4 / 4 Completed

FC drawings 1 Document 9 / 9 Tasks 0 Responses

100%
Description

Completion of whole FC drawings by designer.

9 of 9 completedTasks

  • Cover Sheet Bahar
  • G1 Bahar
  • G2 Bahar
  • G3 Bahar
  • G4 Bahar
  • A1 Bahar
  • A2 Bahar
  • F1 Bahar
  • Designer QA Bahar

of 1 Approved No Documents Documents

No documents attached to this phase.

Discussion 0 Responses

Leave a Reply

QA Project By QA Officer 1 Document 1 / 1 Tasks 0 Responses

100%
Description

QA FC drawings by QA officer

1 of 1 completedTasks

  • QA completed Daryoosh Asadi

of 1 Approved No Documents Documents

No documents attached to this phase.

Discussion 0 Responses

Leave a Reply

Final Amendment 1 Document 1 / 1 Tasks 0 Responses

100%
Description

Final amendment on QA officer markups

1 of 1 completedTasks

  • Final markups amendment Bahar

of 1 Approved No Documents Documents

No documents attached to this phase.

Discussion 0 Responses

Leave a Reply

HOP pack 1 Document 3 / 3 Tasks 0 Responses

100%
Description

Preparation of HOP files

3 of 3 completedTasks

  • SID Bahar
  • WHS Bahar
  • MYD Certificate Bahar

of 1 Approved No Documents Documents

No documents attached to this phase.

Discussion 0 Responses

Leave a Reply

Project Discussion 3 Responses to O1005 – S5839 – Elizabeth Beach

  1. October 24, 2017 at 5:45 am
    Ali Abooi

    AA actualized all related design milestone. BG to amend QA mark ups

  2. January 10, 2018 at 12:43 am
    Daryoosh

    QA has been completed by DA on 10.01.2018

  3. January 13, 2018 at 8:51 am
    Bahar

    All Amendments have been done. (13.01.2018)

    Need to check few things over the phone before submitting the project.